New Compair 17 bar compressor
Nov 26th, 2012| Teckna Group
New Compair 17 bar compressor

As part of the continuing development of the drilling works, Teckna Group have recently purchased a new Compair 17 bar compressor.

Packington Wte
Nov 03rd, 2012| Teckna Group
Packington Wte

Teckna Group install civils work for imminent delievry of the seventh engine.

Geothermal boreholes across Southern England
Nov 01st, 2012| Teckna Group
Geothermal boreholes across Southern England

Working with Solo Heating Renewables to install geothermal boreholes across Southern England

SITA Power – New Crosby Wte
Nov 01st, 2012| Teckna Group
SITA Power – New Crosby Wte

Teckna civils extend New Crosby Wte compound and slabs

Industry Awards
Oct 09th, 2012| Teckna Group
Industry Awards

This is a dummy post just to show how a third News category could look. I’ve added some more text to check what happens on the homepage to the height of the boxes.

Website redesign
Oct 09th, 2012| Teckna Group
Website redesign

We're working on a fresh new web site with Standish-based web designer, lovehtml.co.uk.

Packington Gas Field
Sep 01st, 2012| Teckna Group
Packington Gas Field

Teckna pipe continue to work on Packington gas field as part of the multi million pound retro fit for the gas compound

Installation of 2no boreholes with limited access space
Sep 01st, 2012| Teckna Group
Installation of 2no boreholes with limited access space

Installation of 2no boreholes on a domestic retrofit for geothermal heating with limited access space.

Environmental Works at Narborough
Aug 03rd, 2012| Teckna Group
Environmental Works at Narborough

Teckna Group drilled and installed connection pipe work as part of ongoing remediation works.

Sheet piling retaining wall at Packington compound
Aug 01st, 2012| Teckna Group
Sheet piling retaining wall at Packington compound

Installation of sheet piling retaining wall to enlarge the recently developed Packington compound.

Water well installation for Oxford new build house
Aug 01st, 2012| Teckna Group
Water well installation for Oxford new build house

Hydro-geology report to supply 20,000 litres of water per day for domestic and irrigation use to Oxford new build.

Water well installation on small Carlisle farmstead
Aug 01st, 2012| Teckna Group
Water well installation on small Carlisle farmstead

Another succesful water well installed for a client in Carlisle to supply domestic water and irrigation to a small farmstead.

Installation of new compound at Packington Landfill Site.
Jul 01st, 2012| Teckna Group
Installation of new compound at Packington Landfill Site.

Installation of a new compound at Packington Landfill site.

Teckna Group redevelop Packington Wte generation site
May 01st, 2012| Teckna Group
Teckna Group redevelop Packington Wte generation site

Demolition, installation of concrete retaining wall and diversion of existing drainage.

9 geothermal boreholes to large residential extension
Apr 01st, 2012| Teckna Group
9 geothermal boreholes to large residential extension

Installation of 9 geothermal boreholes to a large residential extension.

March 2012
Mar 21st, 2012| Teckna Group
March 2012

Geothermal drilling to large residence to start with 7no boreholes 100m deep and connecting pipe work back to building.

Ready To Start A New Project? We Want To Hear From You.

Please provide as much information as possible below, and our team will be in touch.

For urgent enquiries, call our head office.

Head Office

Saddle Hill Farm, 277 Preston Road, Standish, WN6 0NZ

    Ready To Start A New Project? We Want To Hear From You.

    Please provide as much information as possible below, and our team will be in touch.

    For urgent enquiries, call our head office.