Installation of a small district system is to be installed in Northampton for a 90kW gshp to supply heating and hot water to a small cluster of properties. The drilling works using the Comacchio MC900P.1 and new mud separator are nearing completion with the boreholes bored through the clays and mudstones to a depth of 150m and grouted up with geothermal graded bentonite, on an average of six hours per borehole, a bit more sunlight and we would be installing 300m per day