Posted On 03rd Aug, 2012 | Posted By Teckna Group
Teckna Group drilled and installed 15no perimeter boreholes through the Mercia Mudstones to intersect the Granite Beds and continue to finsihed depths of 40m deep. On completion of the drilling works the boreholes where connected up to the gas field infrastructure works to enable any migration gases to be controlled from the individual control points installed.
Posted On 03rd Aug, 2012 | Posted By Teckna Group
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.
Saddle Hill Farm, 277 Preston Road, Standish, WN6 0NZ
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.