Posted On 07th Apr, 2013 | Posted By Teckna Group
Teckna Group continue to invest in equipment to ensure more productive time on site and reduce mobilisation times around site.
We continue to invest in our equipment with the additional benefits to mobilise our equipment including ancillary equipment on and off the low loaders and to the drilling site under their own power. All of our equipment including mud pumps, mud puppy solid settlement system and geothermal mixing and looping equipment are now tracked with the benefits of;
From a health and safety perspective this also make for a safer working environment for personnel as equipment is being tracked to and around site rather than having to be lifted and carried with a telehandler or the associated dangers of moving unstable loads and creating deep wheel ruts making uneven working areas and tripping hazards for personnel.
Posted On 07th Apr, 2013 | Posted By Teckna Group
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.
Saddle Hill Farm, 277 Preston Road, Standish, WN6 0NZ
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.