Teckna Group complete the installation of 1200m of 150m gshp boreholes for the refurbishment of a project in Manchester to provide heating for the building and swimming pool.
Each bore was completed in an average of 4 hours with the drilling program completed to cost and ahead of the program schedule allowed for the works.
The collection pipework and manifold can now be installed for the final part of the system prior to the heat pumps being installed by others, whilst the drilling operations move onto their next operation having completed some 3000m of geothermal drilling in the last month and a number of domestic water wells.