Jul 06th, 2013| Teckna Group
Posted On 01st Aug, 2015 | Posted By Teckna Group
Teckna Group have started the drilling works for a 1200m borehole contract for a GSHP installation.
The boreholes are being drilled to 150m deep through 30m of drift before more stable Sandstone to final depths.
Posted On 01st Aug, 2015 | Posted By Teckna Group
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.
Saddle Hill Farm, 277 Preston Road, Standish, WN6 0NZ
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.