Posted On 30th Nov, 2010 | Posted By Teckna Group

Recently completed the sites were drilled with a 450mm auto ejecting barrel to depths of 46m. The wells required temporary 406mm diameter steel casing due to high levels of leachate to install 315mm PE pipe or 250mm diameter permanent steel pipe.

Posted On 30th Nov, 2010 | Posted By Teckna Group

Recent Posts

Ready To Start A New Project? We Want To Hear From You.

Please provide as much information as possible below, and our team will be in touch.

For urgent enquiries, call our head office.

Head Office

Saddle Hill Farm, 277 Preston Road, Standish, WN6 0NZ

    Ready To Start A New Project? We Want To Hear From You.

    Please provide as much information as possible below, and our team will be in touch.

    For urgent enquiries, call our head office.