Jul 15th, 2013| Teckna Group
Posted On 31st Aug, 2010 | Posted By Teckna Group
After a slow start, this project completed successfully and within budget for the installation of the 18 wells to varying depths. All were temporarily cased with 406mm steel to allow the installation of 160mm diameter PE casing.
Posted On 31st Aug, 2010 | Posted By Teckna Group
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.
Saddle Hill Farm, 277 Preston Road, Standish, WN6 0NZ
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.