Posted On 20th Oct, 2014 | Posted By Teckna Group
Teckna Group continue with the latest water borehole by drilling for a hotel situated in the middle of Workington
The borehole has been completed to provide the hotel with all of its water needs based on its annual water consumption. The water tests are now under way following pump testing and on return of these results a full water filtration system will be installed to suit.
Teckna Group are presently drilling water boreholes for a large range of Clients with requirements for instantaneous flow rates from 2 cubic metres per hour up to 15 cubic metres per hour with 125mm pvc liner to 250mm steel liners bedded into rock strata
Should you require more information about our services then please contact us at 01257 421 700 and speak to Sue, or email to
Posted On 20th Oct, 2014 | Posted By Teckna Group
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.
Saddle Hill Farm, 277 Preston Road, Standish, WN6 0NZ
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.