Posted On 01st Aug, 2012 | Posted By Teckna Group
Teckna drilling install a water well to a large new build house in Oxford. Teckna commissioned the hydro-geology report on behalf of the client to supply 20,000 litres per day for domestic and irrigation use to the property. The successful installation has saved the Client £110,000 cost that the water services required to install a mains water supply, and also benefit from virtually free water as well.
Posted On 01st Aug, 2012 | Posted By Teckna Group
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.
Saddle Hill Farm, 277 Preston Road, Standish, WN6 0NZ
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.