Jan 18th, 2013| Teckna Group
Posted On 01st Mar, 2012 | Posted By Teckna Group
Teckna Civils, as part of the enabling works for SITA Packington Wte, widen up the existing roadway with a reinforced concrete slab to enable the extended low loaders to navigate the entrance to the site when delivering the multi million pound engines.
Posted On 01st Mar, 2012 | Posted By Teckna Group
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.
Saddle Hill Farm, 277 Preston Road, Standish, WN6 0NZ
Please provide as much information as possible below, and our team will be in touch.
For urgent enquiries, call our head office.