Installation of ground source heat pump (GSHP) system to improve energy efficiency and reduce operational costs. The installation involved drilling 8 boreholes, each 207 meters deep.
The works sites required Geo602’s along with a mud recycling units, Avant 860i forklift, loop reeler, grouter and 3 x 10,000L water tanks.
• Number of Boreholes: 8 at 207 metres with a total of 1656m drilled
• Restricted Access: Front gate access width only 2.2m wide