Mid Devon District Council at Exe Valley Leisure Centre and Lords Meadow

Installation of ground source heat pump (GSHP) system at two of their leisure centres to improve energy efficiency and reduce operational costs. The installation involved drilling 48 boreholes, each 200 meters deep, along with necessary headering works with testing, purging, glycol fill and system balancing.

 

Exe Valley was the larger of the two centres with the works being done in their main carparking areas. The centre had to have partial parking along with full access to the centre at all times for the public along with numerous school coaches and bus parties.

 

The project was conducted in phases to avoid a total closure of the leisure centre’s car park, ensuring that the centre remained accessible throughout the project.

 

The works for both sites required a tight completion deadline and utilised three of our Comacchio Rigs, the MC 900P.1 and two Geo602’s along with 3 mud recycling units, loop and grouters to service each rig.

 

• Number of Boreholes: 48 at 200 metres with a total of 9,600m drilled

• Ground source Headering: Including specialised Manifolds shipped in from Germany and manufactured. As bespoke units to carry 40ton traffic.

• Phased Implementation: The project was conducted in phases to ensure continuous access to parts of the car park.

Contact Us

Fill out the form below or contact us on the 01257 421700 to speak to an expert

    Our Recent Projects

    Find out more about our recent projects.

    project
    Whinney Hill

    Whinney Hill Social Housing Project

    Read More
    project
    Kaon Office Block

    Ground Source Boreholes and Water Well Installation at Kaon Office Block

    Read More
    project
    Exe Valley Leisure Centre

    Mid Devon District Council at Exe Valley Leisure Centre and Lords Meadow

    Read More
    project
    Felixstowe

    Felixstowe Social Housing Development

    Read More
    project
    Pampisford Hall

    Installation of Open Loop Water Well at Pampisford Hall

    Read More
    project
    Chester

    Domestic Ground Source Drilling

    Read More

    Ready To Start A New Project? We Want To Hear From You.

    Please provide as much information as possible below, and our team will be in touch.

    For urgent enquiries, call our head office.

    Head Office

    Saddle Hill Farm, 277 Preston Road, Standish, WN6 0NZ

      Ready To Start A New Project? We Want To Hear From You.

      Please provide as much information as possible below, and our team will be in touch.

      For urgent enquiries, call our head office.